Projects
-
-
Quadrilatero Umbria-Marche, Italy - Maxilotto 1
2006 - In progressGeotechnical design to address all relevant problems along the path: embankments, cuttings, viaducts, tunnels, retaining structures etc.
-
Milano - Cascina Gobba underground junction
2007 - In progressDesign and assistance during construction works. Cut-and-cover tunnel and deep excavations.
-
Parma, Italy - PRU ""Ex Boschi"" FS railway station
2006 - In progressDesign and assistance during construction works.Detailed design: retaining structures of high (15m) excavations in urban area in problematic geotechnical and hydro-geological conditions.Reinforced concrete and steel structures (2 levels underground and 6 levels over ground, over a surface of about [...] -
Bridge crossing Messina Strait
2010 - In progressControl of the detailed design of the bridge foundations (tower and anchor blocks) and of the roads and railway links (foundations of civil structures; tunnels and tunnels portals). The bridge main span is 3300m long; it is supported by two towers of 360m height. The tower foundations include diaph [...] -
Quadrilatero Umbria - Marche, Maxilotto 2
2010 - In progressGeological and geomechanical design of the alternative location for the tunnels along a new road.
-
Chioggia, Italy - Venice preservation from high tide
2005 - In progressGeotechnical assistance in the design of dam caissons at Chioggia mouth, with the purpose of protecting Venice from high tide.Assistance in the design of an additional system to prevent water from entering the deep excavation used for caissons construction.Soil modelling for the design of the base [...] -
Lecco - Mine for magnesium production
2011Technical evaluation of the design of the mining tecnique and of the related long term recovery of the natural features of the mined area. Scope of the work was to support certification of the annual report of the Owner by Ernst & Young.
-
Falerna, Italy - Coastal protection works
2008 - 2011Geological and geotechnical design, supervision of the coastal protection works in the Falerna city coast by means of adequate barriers.
-
Autostrada Bre. Be. Mi.
2009 - 2011Geotechnical design to address all relevant problems along the path: embankments, cuttings, viaducts, artificial tunnels below the water table.Design of temporary works for foundations of the Adda and Oglio viaducts. Detailed geological and geomorphological design at the main works of art. General [...] -
Porto Torres - Waste disposal for dangerous materials
2010Geological, geotechnical hydro-geological and civil design of a new waste disposal site for the reclamation of the Minciaredda South area in the oil plant of Porto Torres
-
Doubling Genova Ventimiglia railway – Section Andora Finale
2010Specialistic support for geomechanical and structural design of tunnels (Caprazoppa, Monte Grosso, Castellari, Croce, Pineland, Alassio; 47 km of tunnels, 37 km excavated by TBM) and of Alassio underground station.
-
Bridge crossing the Po river
2009 - 2010Detailed Design of the foundations for the standing and abutment piers.
-
Milano - Redevelopment of the hospital area Ospedale Maggiore
2009 - In progressMulti-storey tower building with two levels underground
Geological and seismic reports
Geotechnical report for foundations and retaining structures (including those designed to prevent damage in existing structures)
Hidrological and hydraulic reports (FEED only) -
Lamezia Terme, Italy - Structural plan of the city
2009 - 2010Geological, geomorphological and seismic study of the whole county territory (>160 square km) within the framework of law 19/02, and preparation of relevant legal technical norms.